What the service can include
The exact CMT scope is confirmed order by order. “CMT” may mean different responsibilities to different buyers; Texon therefore defines in writing what is supplied by the buyer and what is handled by Texon before production confirmation.
-
Pre-production review of tech pack, approved sample, measurement specification and workmanship requirements.
-
Fabric and trim receiving / readiness confirmation according to agreed scope.
-
Cutting and bundle control.
-
Stitching and assembly according to approved construction requirements.
-
Thread trimming, checking, finishing and pressing where required.
-
Measurement and workmanship checkpoints during production.
-
Label, folding, polybag and carton packing according to buyer instructions.
-
Dispatch-readiness coordination and production documentation agreed for the program.
What we need from the buyer
-
Tech pack or complete product reference.
-
Measurement chart and size range.
-
Approved construction / workmanship requirements.
-
Fabric and trim responsibility
buyer supplied or Texon sourced.
-
Artwork, labels, branding and placement instructions where applicable.
-
Packing specification.
-
Order quantity by style / color / size.
-
Target delivery date and destination information.
Typical CMT production flow
-
RFQ and feasibility review.
-
Specification and material responsibility confirmation.
-
Sample / approved reference alignment.
-
Pre-production readiness check.
-
Cutting and issue to stitching.
-
Inline production checks and corrections.
-
Finishing, measurement and final checking.
-
Packing verification and dispatch readiness.
Best suited for
Brands, importers, sourcing offices, wholesalers and other B2B buyers that have an established product requirement and want controlled manufacturing execution without outsourcing buyer-side product decisions.
Request a CMT quotation
For the fastest review, attach the tech pack or reference product and include quantity, fabric responsibility, size range, packing requirements and target delivery date.
Discuss Your Requirement